East Cape Road Upgrade
Siteworx have mobilized a team onsite at the East Cape to upgrade an 8.5km section of what is currently a gravel road – we are upgrading it to chip-seal, removing all the existing culverts, and reinstalling new ones – expected completion date is Christmas 2020.
Phase 1 – drainage – is complete, with the team currently working on Phase 2: Heavy Metaling. We also have a team from Higgins onsite who are giving us a hand with stabilizing the road.
QUICK FACTS:
- 8.5km of road
- 45 concrete culverts to replace
- Duration: September 2020 – December 2020
(4 months) - 5 Team Members